Engineer | Form: (02 ) 401256311 7/13/2017 | Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 3) and ensure all applicable documentation is submitted. Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
API #(005-06473), GLADYS CAVANAUGH 1 API #(005-06502) CAVANAUGH 2
|
Engineer | Form: (02 ) 401256311 7/13/2017 | Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, or adequately demonstrate isolation is present, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
(API #005-06523), , Cavanaugh 3 ; (API #005-06858), COLUMBINE-STATE 1 ;
( API # 005-06488), CAVANAUGH 1-X ; (API # 005-06834) , CARRAWAY-MCCALLAN 1;
|
Engineer | Form: (02 ) 401256311 7/13/2017 | Operator acknowledges the proximity of the listed non-operated wells. Operator assures
that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option
4). Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT
CONDITION”) stating that appropriate mitigation was completed, prior to the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation.
Operator will provide a cement bond log verifying aquifer protection in the listed well.
API #005-06964, UPRC 21X-21
|
Engineer | Form: (02 ) 401256311 7/13/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
|
Engineer | Form: (02 ) 401256311 7/13/2017 | Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation.
2) 6 months after rig release, prior to stimulation.
3) Within 30 days of first production, as reported on Form 5A.
|