| Drilling/Completion Operations | Form: (02 ) 401166555 4/24/2017 | Open-hole Resistivity Log with Gamma Ray Log will be run from the kick-off point into the surface casing. A Cement Bond Log with Gamma-Ray will be run on production casing, or on intermediate casing if a production liner is run. The horizontal portion of the wellbore will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, will list all logs run and have those logs attached. |
| Drilling/Completion Operations | Form: (02 ) 401405988 9/29/2017 | Open-hole Resistivity Log with Gamma Ray Log will be run from the kick-off point into
the surface casing. A Cement Bond Log with Gamma-Ray will be run on production
casing, or on intermediate casing if a production liner is run. The horizontal portion of
the wellbore will be logged with a measured-while-drilling gamma-ray log. The Form 5,
Completion Report, will list all logs run and have those logs attached. |