Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-005-07223Prosper Farms 4-65 11-12
1H
CRESTONE PEAK RESOURCES OPERATING LLC
10633
PR
1/1/2025
DJ HORIZONTAL NIOBRARA
16950
ARAPAHOE  005
NWNW 11 4S65W 6
436855View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400558778
03/02/2014
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400558778
4/20/2014
MOU Document is attatched
Drilling/Completion OperationsForm: (02 )
400558778
4/20/2014
Open hole resistivity log with gamma ray will be run on the vertical portion of every well on this pad to describe the stratigraphy of the vertical section of the wellbore and to adequately verify the setting depth of the surface casing and aquifer coverage.