| Engineer | Form: (02) 400406107 06/25/2013 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from end of 7" casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| OGLA | Form: (04) 404179305 05/16/2025 | Operator committed to the following Best Management Practices in the attached email of the CPW consultation: Operations are currently scheduled to occur outside the pronghorn winter season (Jan 1 - Apr 30). Operations will be conducted during daylight hours only. |
| Engineer | Form: (04) 404179305 05/16/2025 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations.
2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. |