Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-005-07209Tebo 29
2H
CRESTONE PEAK RESOURCES OPERATING LLC
10633
PR
9/1/2025
DJ HORIZONTAL NIOBRARA
16950
ARAPAHOE  005
SWNW 28 4S64W 6
433545View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400406107
06/25/2013
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from end of 7" casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
OGLAForm: (04)
404179305
05/16/2025
Operator committed to the following Best Management Practices in the attached email of the CPW consultation: Operations are currently scheduled to occur outside the pronghorn winter season (Jan 1 - Apr 30). Operations will be conducted during daylight hours only.
EngineerForm: (04)
404179305
05/16/2025
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (04 )
404179305
5/16/2025
Lights: Operator will conduct operations during daylight hours only.
Odor mitigationForm: (04 )
404179305
5/16/2025
Nuisance odors are not anticipated for this Operation, however, will be monitored and treated, as necessary. Daily Operation summaries will document to ensure all BMP’s and COA’s are met.