| Engineer | Form: (06) 400470525 08/29/2013 | 1) Provide 24 hour notice of MIRU to Randell Johnson at 303-655-7472 or e-mail at Randell.Johnson@state.so.us.
2) For 2150’ plug: pump plug and displace, shut-in, WOC 4 hours and tag plug. Must be 2050’ or shallower. If 850’ plug not circulated to surface, place 10 sx at surface. Leave at least 100’ cement in the casing for each plug.
3) Properly abandon flowlines as per Rule 1103. |