WELL05-005-07006BENNETT
A-4
AXIS EXPLORATION LLC
10646
SI
5/1/2018
BOMBING RANGE
7155
ARAPAHOE  005
SWNE 29 4S63W 6
320787View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
402323494
2/26/2020
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06 )
402323494
2/26/2020
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Prior to placing the 1831' plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 1622' or shallower and provide 10 sack plug at surface. 4) Leave at least 100’ of cement in the wellbore for each plug. 5) Properly abandon on-location flowlines as per Rule 1105. File electronic Form 42 once abandonment is complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line, the operator must submit a Flowline Report, Form 44. 6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed. 7) After placing the shallowest hydrocarbon isolating plug (7828'), operator must wait a sufficient time to confirm static conditions. If at any time after placing this plug there is evidence of pressure or of fluid migration, contact COGCC engineering before continuing operations.
EngineerForm: (06 )
402323494
2/26/2020
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure.
EngineerForm: (04 )
402110145
4/7/2020
Well was not returned to production. New application for flaring must occur prior to return to service.
OGLAForm: (04 )
404044084
1/17/2025
This oil and gas location is within a CPW mapped Pronghorn Winter Concentration Area High Priority Habitat. If well completion activities must occur between January 1 to April 30, prior to conducting the activities, Operator will not start operations with heavy machinery before 8 a.m. and will cease at 4 p.m.
EngineerForm: (04 )
404044084
1/23/2025
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (04 )
404044084
1/23/2025
Lights: Operator will conduct operations during daylight hours only.
Community Outreach and NotificationForm: (04 )
404044084
1/23/2025
Prior to commencing operations, the Operator will provide an informational sheet to the owners/occupants of RBUs nearby and adjacent to the parcel on which the well is located. The sheet will include the Operator's contact information and the nature, timing, and expected duration of the operations.
Noise mitigationForm: (04 )
404044084
1/23/2025
Operator will comply with maximum permissible noise levels pursuant to Rule 423 and will install temporary sound walls, straw bales, or other BMPs to aid in sound attenuation if necessary
Odor mitigationForm: (04 )
404044084
1/23/2025
Nuisance odors are not anticipated for this Operation, however, will be monitored and treated, as necessary. Daily Operation summaries will document to ensure all BMP’s and COA’s are met.