| Engineer | Form: (02) 400300228 07/19/2012 | Prior to recomplete, operator must: 1) Verify existing cement with a cement bond log. 2) If it is not present as follows, provide remedial cement 200’ above Niobrara (minimum cement top of 7530’), and 2103’ (DV tool) into the surface casing shoe. Verify remedial cement coverage with cement bond log. |
| Engineer | Form: (04) 402570949 01/29/2021 | If well is not producing by December 18, 2022, an official MIT will need to be done. |
| Engineer | Form: (04) 403362514 04/06/2023 | If well is not producing by April 30, 2025, an official MIT will need to be done. |
| Engineer | Form: (04) 403362514 04/06/2023 | Well has been designated Inactive as of 05/31/2018. Submit a Form 5B, Inactive Well Notice. |