Engineer | Form: (04 ) 402099307 5/8/2020 | This approval is good for one year and new application must be made before July 1, 2020. Compliance with CDPHE requirements shall be documented at that time. |
Engineer | Form: (04 ) 402099307 5/8/2020 | 1) Flaring of natural gas shall comply with COGCC Rule 912.
2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice.
3) Report metered flaring volumes on Form 7, Operator’s Monthly Report of Operations.
4) The operator is required to obtain and maintain any required air permits from CDPHE.
5) The expectation for permanent flares controlling separators will be an enclosed combustion device with a 98% design destruction efficiency for hydrocarbons. Operator shall manage this well so that production volumes do not exceed the combustor capacity.
6) Notify the local emergency dispatch or the local governmental designee of natural gas flaring.
|