Permit | Form: (02 ) 403453707 11/28/2023 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017). |
Permit | Form: (02 ) 403453707 11/28/2023 | Operator will log two (2) additional wells during the second rig occupation with open-hole resistivity log with gamma-ray log from the kick-off point into the surface casing for the stratigraphically deepest wells on each side of the pad for a total of three wells logged.
|
Permit | Form: (02 ) 403453707 12/18/2023 | Pursuant to Rule 702.b.(2), the approval of this Application for Permit to Drill constitutes a "change in circumstance" to the approved Financial Assurance Plan. The Operator must file a revised Form 3, Financial Assurance Plan, within 10 days of this approval. |
Engineer | Form: (02 ) 403453707 1/30/2024 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation.
2) If a delayed completion, a second test is required between 6-9 months after rig release and must be conducted prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance. |
Engineer | Form: (02 ) 403453707 1/30/2024 | Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document per the DJ Basin Horizontal Offset Policy using Option 4. Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. No stimulation will occur within 1500; of this well bore. A statement shall be included on the Form 5A of the affected wells that documents the excluded and the reduced treatment intervals.
001-06948 OHD #1 (Vessels O&G) |
Engineer | Form: (02 ) 403453707 1/30/2024 | Operator acknowledges the proximity of the listed wells. Operator assures that this offset will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document (option 4). Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. Surface and production casing pressures of this offset well list will be actively monitored during stimulation of this well. Operator will assure that the offset well’s bradenhead is open to a tank and actively monitored to ensure no flow or fluid is seen during completion operations. If there is indication of communication between the stimulation treatment and an offset well, treatment will be stopped and ECMC Engineering notified.
001-10065 Prairie LE #17-019HC (PDC)
001-10070 Prairie LE #17-018HNX (PDC)
001-10076 Prairie LE #18-031HC (PDC)
001-10078 Prairie LE #17-021HN (PDC) |
Engineer | Form: (02 ) 403453707 1/30/2024 | Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document Operator using Option 3. Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
001-08515 Ritchey #1-19 (Petrodyne Production) |
Engineer | Form: (02 ) 403453707 1/30/2024 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 2 business day spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j. and provide cement coverage from TD to a minimum of 500' above Niobrara. Verify coverage with a cement bond log. |