| Engineer | Form: (02) 401152228 01/23/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from TD” to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
|
| Engineer | Form: (02) 401152228 01/23/2017 | Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.:
1) Within 60 days of rig release, prior to stimulation.
2) 6 months after rig release, prior to stimulation.
3) Within 30 days of first production, as reported on Form 5A.
|
| Permit | Form: (04) 401482842 12/14/2017 | This Sundry Notice Form 4 authorizes changes in the drilling/casing/cementing program as shown on the Drilling Permit Form 2 and must be visibly posted with the permit during drilling. |
| Engineer | Form: (04) 404335327 10/03/2025 | 1. Must conduct a bradenhead test no later than 11/03/2025. The Form 17 must be submitted within 10 days of the bradenhead test date. Email the area inspector and engineer minimum 10 days prior to conducting the bradenhead test to allow for a witnessed bradenhead test. Submit form 42-Other “Alternative MIT/Bradenhead test” minimum 10 days prior to conducting the bradenhead test.
2. If well is not producing by October 3, 2026, an official MIT will need to be performed and submitted on a Form 21 no later than 10/30/2026. |