| General Housekeeping | Form: (02 ) 401096990 2/9/2017 | All surface trash, debris, scrap or discarded material will be removed daily or weekly as necessary and in a legal manner. |
| Storm Water/Erosion Control | Form: (02 ) 401096990 2/9/2017 | Storm Water Management Plan (SWMP) will be in place to address construction, drilling and operations associated with oil and gas development through the state of Colorado in accordance with CDPHE General Permit Rules. BMP’s will vary according to location and will remain in place until the pad reaches final reclamation. |
| Material Handling and Spill Prevention | Form: (02 ) 401096990 2/9/2017 | Spill prevention control and countermeasure plan is in place to address construction, drilling and operations associated with oil and gas development throughout the state of Colorado in accordance with CFR 112. |
| Drilling/Completion Operations | Form: (02 ) 401096990 2/9/2017 | Open-hole Resistivity Log with Gamma Ray Log will be run from the kick-off point into the surface casing. A Cement Bond Log with Gamma-Ray will be run on production casing, or on intermediate casing if a production liner is run. The horizontal portion of the wellbore will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, will list all logs run and have those logs attached.
|
| Drilling/Completion Operations | Form: (02 ) 401526114 10/27/2018 | Open-hole Resistivity Log with Gamma Ray Log will be run from the kick-off point into the surface casing on one of the first wells drilled. A Cement Bond Log with Gamma-Ray will be run on production casing, or on intermediate casing if a production liner is run. The horizontal portion of the wellbore will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, will list all logs run and have those logs attached. |
| Drilling/Completion Operations | Form: (02 ) 401526114 10/27/2018 | If a skid is performed for the subject well, then the only required BOPE tests will be for any broken BOPE connections, as long as a full BOPE test was performed at the beginning of the pad, and as long as all necessary BOPE tests are completed at least every 21 days during the pad operations. |