Planning | Form: (02 ) 400990383 11/4/2016 | Visual Mitigation: The location was placed to utilize a natural and existing tree line that will act as a visual barrier. |
General Housekeeping | Form: (02 ) 400990383 11/4/2016 | Guy Line Anchors: All guy line anchors left buried for future use will be identified by a marker of bright color not less than four feet in height and not greater than one foot further of the guy line anchor. |
General Housekeeping | Form: (02 ) 400990383 11/4/2016 | Removal of Surface Trash: PetroShare agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location. |
Material Handling and Spill Prevention | Form: (02 ) 400990383 11/4/2016 | Leak Detection Plan: The Leak Detection Plan has been included as an Attachment "OTHER" (Document #1010088). |
Material Handling and Spill Prevention | Form: (02 ) 400990383 11/4/2016 | Berm Construction: A steel containment berm or structure will be erected around the oil and water storage tanks. The steel berm will be inspected at least every 14 calendar days while the site is under construction and within 24 hours of a precipitation event. During production phase One to seven inspections per week will be recorded and kept in the district office and available to regulatory agencies. Records will be kept electronically indefinitely. |
Material Handling and Spill Prevention | Form: (02 ) 400990383 11/4/2016 | Tank specifications: Tanks shall be constructed and maintained in accordance with the National Fire Protection Association Code 30 (2008 version). All tanks will be visually inspected once a day. Recorded inspections will be conducted once a month pursuant to 40 CFR §112. |
Dust control | Form: (02 ) 400990383 11/4/2016 | Dust mitigation measures shall include but are not limited to the use of speed restrictions, regular road maintenance, restrictions of construction activities during high wind days, and silica dust controls when handling sand used in hydraulic fracturing operations. The access road will be constructed with road base aggregate material. Additional management practices such as road surfacing, wind breaks and barriers may be used. |
Construction | Form: (02 ) 400990383 11/4/2016 | Visual Mitigation: Pursuant to Rule 804, the tank battery shall be painted in uniform, non-contrasting, non-reflective color tones with the colors matched to but slightly darker than the surrounding landscape. The location was selected due to an existing tree line that will act as a visual barrier. |
Construction | Form: (02 ) 400990383 11/4/2016 | Fencing: The wellsite will be fenced for security and in concurrence with surface owner. |
Noise mitigation | Form: (02 ) 400990383 11/4/2016 | PetroShare shall use, at a minimum a 32’ sound wall along the south and a partial wall on the west side of the pad site, with an STC-27 rating or higher. |
Odor mitigation | Form: (02 ) 400990383 11/4/2016 | PetroShare will comply with Rule 805 and Department of Public Health and Environment, Air Quality Control Commission, Regulation No. 2 Odor Emission, 5 C.C.R. 1001-4, Regulation No. 3 (5 C.C.R. 1001-5), and Regulation No. 7 Section XVII.B.1 (a-c) and Section XII. |
Drilling/Completion Operations | Form: (02 ) 400990383 11/4/2016 | Closed Loop System: A Closed Loop System will be used for drilling and fluid management. No reserve pit will be used. |
Drilling/Completion Operations | Form: (02 ) 400990383 11/4/2016 | Rig with Kelly: The BOP will include a minimum of double ram with blind ram pipe ram, annular preventer or a rotating head. At least one (1) person with training for blowout prevention will be on location during all drilling operations. |
Drilling/Completion Operations | Form: (02 ) 400990383 11/4/2016 | Control of Fire Hazards: PetroShare and its contractors will employ best management practices during the drilling and production of its wells and facilities. They will comply with appropriate COGCC and any county rules concerning fire and safety. PetroShare will ensure that any material not in use that may constitute a fire hazard will remain no less than 25 feet from the wellhead (s), tanks and separator(s). |
Drilling/Completion Operations | Form: (02 ) 400990383 11/4/2016 | Logging: One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run. |
Drilling/Completion Operations | Form: (02 ) 400990383 11/4/2016 | Green Completions: Emission Control Systems. Test separators and associated flow lines and sand traps shall be installed on-site to accommodate Green completion techniques pursuant to COGCC Rules. PetroShare intends to utilize pipelines to transport oil and gas, reducing the amount of onsite tanks to one. PetroShare will utilize a VOC to reduce emissions. |
Drilling/Completion Operations | Form: (02 ) 400990383 11/4/2016 | BOPE Testing for Drilling Operations: BOPE tests will be done upon initial rig-up and once every 30 days during drilling operations, pressure testing of the casing string and each component of the BOPE will be performed to 70% of working pressure or 70% of the internal yield of the casing, whichever is less. |
Drilling/Completion Operations | Form: (02 ) 400990383 11/4/2016 | Lighting: All permanent lighting will be directed downward and internally. Temporary lighting shall conform to COGCC rules and regulations and not adversely affect adjacent residential properties. The nearest public road is 900’ away. Lighting from the location will not affect visibility on the road. There is a natural tree barrier between the location and the nearest public road to mitigate light pollution. |
Drilling/Completion Operations | Form: (02 ) 400990383 11/4/2016 | Anti-Collision BMP: Anti-Collision: PetroShare will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice will be given to all offset operators within 150 feet prior to drilling. |
Drilling/Completion Operations | Form: (02 ) 400990383 11/4/2016 | BOPE for well servicing operations: Adequate blowout prevention equipment will be used on any servicing operations associated with this well. Backup staving valves shall be required on well servicing operations during reverse circulation. Valves will be pressure tested before each well servicing operation using both low-pressure and high-pressure fluid. |
Drilling/Completion Operations | Form: (02 ) 400990383 11/4/2016 | Drill Stem Tests: Not applicable. No drill stem tests are planned. |
Final Reclamation | Form: (02 ) 400990383 11/4/2016 | Well site cleared. Within 90 days subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site. |