WELL05-001-09898Ivey
I-11-2HC
PDC ENERGY INC
69175
AL
8/8/2019
SPINDLE
77900
ADAMS  001
SWSE 11 1S68W 6
442411View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400799812
7/12/2015
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU for first well on pad, subsequent wells 48 hours prior to spud. 2) Comply with Rule 317.j. and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with cement bond log.
EngineerForm: (02 )
400799812
11/15/2015
Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. REHFELD K UNIT 1, API # 001-08886, SACK #1 API # 001-07059 BYDALAK #1-11 API # 001-08368 BYDALEK #2-11 API # 001-08881 SACK G UNIT #1 API # 001-08895
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
400799812
11/20/2015
Multi-well Pads. It is a multi-well pad located in a manner which allows for resource extraction while maintaining the highest distances posssible from the offsetting residential areas.
Traffic controlForm: (02 )
400799812
11/20/2015
Access roads. The access road will be constructed to accommodate local emergency vehicles. This road will be maintained for access at all times.
General HousekeepingForm: (02 )
400799812
11/20/2015
Fencing requirements. A permanent fencing plan will be reviewed by the surface owner, and the applicant.
General HousekeepingForm: (02 )
400799812
11/20/2015
Removal of surface trash. All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as is applicable.
Material Handling and Spill PreventionForm: (02 )
400799812
11/20/2015
Leak Detection Plan. Pumper will visit the location daily and visually inspect all tanks and fittings for leaks. Additionally, monthly documented SPCCP inspections are conducted pursuant to 40 CFR 112.
Material Handling and Spill PreventionForm: (02 )
400799812
11/20/2015
Berm Construction. Tank berms shall be constructed of steel rings with a synthetic or engineered liner and designed to contain 150% of the capacity of the largest tank. All berms will be visually checked periodically to ensure proper working condition.
Material Handling and Spill PreventionForm: (02 )
400799812
11/20/2015
Load Lines. All load lines shall be bull-plugged or capped.
Material Handling and Spill PreventionForm: (02 )
400799812
11/20/2015
Tank specifications. Tanks will be designed, constructed and maintained in accordance with NFPA Code 30. The tanks are visually inspected once a day for issues and recorded inspections are conducted once a month.
Drilling/Completion OperationsForm: (02 )
400799812
11/20/2015
Green Completions - Emission Control Systems. Test separators and associated flow lines and sand traps shall be installed on-site to accommodate Green completion techniques pursuant to COGCC Rules. In the anticipated absence of a viable gas sales line, the flow-back gas shall be thermally oxidized in an emissions control device (ECD), which will be installed and kept in operable condition for at least the first 90 days of production pursuant to CDPHE rules. The ECD shall have an adequate capacity for 1.5 times the largest flow-back within a 10 mile radius, will be flanged to route gas to other or permanent oxidizing equipment and shall be provided with the equipment needed to maintain combustion where non-combustible gases are present.
Drilling/Completion OperationsForm: (02 )
400799812
11/20/2015
Blowout preventer equipment ("BOPE"). A double ram and annular preventer will be used during drilling. At least the drilling company shall have a valid well blowout prevention certifications.
Drilling/Completion OperationsForm: (02 )
400799812
11/20/2015
BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing valves shall be installed in the event of reverse circulationand shall be prior tested with low and high pressure fluid.
Drilling/Completion OperationsForm: (02 )
400799812
11/20/2015
Drill stem tests. Not applicable, no Drill stem tests are planned.
Drilling/Completion OperationsForm: (02 )
400799812
11/20/2015
Control of Fire Hazards. All materials which are considered fire hazards shall be a minimum of 25' from the wellhead tanks or separators. Electrical equipment shall comply with API RP 500 and will comply with the current national electrical code. An emergency response plan has been generated for this site.
Drilling/Completion OperationsForm: (02 )
400799812
11/20/2015
Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c(2)Q.
Drilling/Completion OperationsForm: (02 )
400799812
11/20/2015
Closed Loop Drilling Systems - Pit Restrictions. Not Applicable; a closed loop system will be used for drilling.
Drilling/Completion OperationsForm: (02 )
400799812
11/20/2015
Pit Level indicators. Not applicable; a closed-loop system will be used and no pits shall be dug.
Drilling/Completion OperationsForm: (02 )
400799812
11/20/2015
One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.
Final ReclamationForm: (02 )
400799812
11/20/2015
Well site cleared. Within 90 days subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site.
Final ReclamationForm: (02 )
400799812
11/20/2015
Identification of plugged and abandoned wells. P & A'd wells shall be identified pursuant to 319.a.(5).