Planning | Form: (02 ) 400662938 9/29/2015 | Development from existing well pads: In order to reduce surface disturbance, Ward is permitting this 2A for twelve (16) wells. |
General Housekeeping | Form: (02 ) 400662938 9/29/2015 | Guy Line Anchors: All guy line anchors left buried for future use will be identified by a marker of bright color not less than four feet in height and not greater than one foot east of the guy line anchor. |
General Housekeeping | Form: (02 ) 400662938 9/29/2015 | Removal of Surface Trash: Ward agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location. |
Material Handling and Spill Prevention | Form: (02 ) 400662938 9/29/2015 | Leak Detection Plan: To ensure protection for the surface during fracturing treatment, the location will be specifically constructed to contain any releases or spills. Secondary containment from any chemical spills or leaks will surround any trucks that carry, mix, or add chemicals to the flow stream as well as connections that could possibly leak fluid. Should any spill or release occur, every reasonable step will be taken to quickly remediate the area disturbed. |
Material Handling and Spill Prevention | Form: (02 ) 400662938 9/29/2015 | Control of Fire Hazards: Ward and its contractor’s employ best management practices during the drilling and production of its wells and facilities. They will comply with appropriate COGCC and any county rules concerning fire and safety. Ward will ensure that any flammable material will remain no less than 25 feet from the wellhead (s), tanks and separator(s).
|
Material Handling and Spill Prevention | Form: (02 ) 400662938 9/29/2015 | Berm Construction: A containment berm will be constructed around the oil and water storage tanks. The berm will be inspected regularly and maintained in good condition. |
Material Handling and Spill Prevention | Form: (02 ) 400662938 9/29/2015 | Tank specifications: Tanks shall be constructed and maintained in accordance with the National Fire Protection Association Code 30 (2008 version). All tanks will be visually inspected once a day for issues. Recorded inspections will be conducted once a month pursuant to 40 CFR §112. |
Drilling/Completion Operations | Form: (02 ) 400662938 9/29/2015 | Closed Loop System: Closed Loop System will be used for drilling and fluid management. No reserve pit will be used. |
Drilling/Completion Operations | Form: (02 ) 400662938 9/29/2015 | Green Completions: Ward will comply with COGCC Rule 805b.(3)A and utilize Green Completion Methods. |
Drilling/Completion Operations | Form: (02 ) 400662938 9/29/2015 | BOPE Testing: Upon initial rig-up and once every 30 days during drilling operations, pressure testing of the casing string and each component of the BOPE will be performed to 70% of working pressure or 70% of the internal yield of the casing, whichever is less. |
Drilling/Completion Operations | Form: (02 ) 400662938 9/29/2015 | BOPE for well servicing operations: Adequate blowout prevention equipment will be used on any servicing operations associated with this well. Backup staving valves shall be required on well servicing operations during reverse circulation. Valves will be pressure tested before each well servicing operation using both low-pressure and high-pressure fluid. |
Drilling/Completion Operations | Form: (02 ) 400662938 9/29/2015 | BOPE: Ward will utilize drilling rigs with a minimum of a double ram and annular preventer. |
Drilling/Completion Operations | Form: (02 ) 400662938 9/29/2015 | Drill Stem Tests: Drill Stem Tests are not anticipated for this location. |
Drilling/Completion Operations | Form: (02 ) 400662938 9/29/2015 | Pit Level Indicators: Pit Level Indicators will not be needed as no pits will be used on location. |
Drilling/Completion Operations | Form: (02 ) 400662938 9/29/2015 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.
|
Final Reclamation | Form: (02 ) 400662938 9/29/2015 | Identification of Plugged and Abandoned Wells: Pursuant to Rule 319.a.(5)., once the well has been plugged and abandoned, Ward will identify the location of the wellbore with a permanent monument that will detail the well name and date of plugging. |
Final Reclamation | Form: (02 ) 400662938 9/29/2015 | Well site cleared. Within 90 days subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site. |