COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
401662923
7/22/2018
Submit PDF or TIF of Induction Log with Subsequent Report of Abandonment.
EngineerForm: (06 )
401662923
7/22/2018
Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements and changes to approved plugging procedure. Form 17 shall be submitted within 10 days.
EngineerForm: (06 )
401662923
7/22/2018
NOTE: Changes in plugging procedure - plug depths changed - additional cement 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44.
 
COGIS - Best Management Practice Results
No records to display.