Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-001-08924VERLA SMALL
2-17
PAINTED PEGASUS PETROLEUM LLC
10711
PA
6/6/2017
CHIEFTAIN
11060
ADAMS  001
NENE 17 2S63W 6
320304View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401266756
05/31/2017
Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements. Form 17 shall be submitted within 10 days.
EngineerForm: (06)
401266756
05/31/2017
NOTE: Changes in plugging procedure - plugs changed to perforate and pump and plug listed as half in-half out surface casing is actually perforated at 500' and 130 sx pumped, this plug needs to be tagged at 170' or shallower. 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Place plug at 1320', tag plug, must be 1220' or shallower. If surface casing shoe plug not circulated to surface then tag plug – must be 230’ or shallower and provide 10 sx plug at the surface (inside and outside of casing). 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.