| Engineer | Form: (06) 400678168 11/03/2014 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) For 1100’ plug: pump plug and displace. If surface casing plug not circulated to surface then tag plug – must be 120’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ cement in the casing for each plug.
3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|
| Engineer | Form: (04) 401903939 02/25/2019 | Casing repairs should be pressure tested (>300#) after drilling out and before placing liner (second string). COGCC should be contacted if casing doesn't test. |