| Engineer | Form: (04) 401824337 01/08/2019 | This approval is good for one year and a new application must be made before November 30, 2019. Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|