WELL05-001-08142WAILES G UNIT
1
PDC ENERGY INC
69175
PA
9/16/2017
CHIEFTAIN
11060
ADAMS  001
SENE 4 2S63W 6
320121View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
401349203
8/8/2017
Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements. Form 17 shall be submitted within 10 days.
EngineerForm: (06 )
401349203
8/8/2017
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.