| Engineer | Form: (04) 400712746 10/22/2014 | Place additional cement to isolate the Upper and Lower Arapahoe aquifers. Perforate at 800' and place at least 40 sx behind casing(140' minimum). Perforate at 500' and place at least 40 sx behind casing.
Submit Form 5, Drilling Completion Report once work is complete - include previously undocumented cement at ~2000'. |