Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-001-08059ANDERSON
4
BAYSWATER EXPLORATION & PRODUCTION LLC
10261
PA
12/14/2018
SUN
80200
ADAMS  001
NENW 10 2S61W 6
320109View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (04)
400591717
05/02/2014
PER RULE 1003.e.(3) OPERATOR SHALL SUBMIT SUNDRY NOTICE REPORTING SITE IS READY FOR INTERIM RECLAMATION INSPECTION WHEN VEGETATION REACHES 80% COVERAGE. Approval of this Sundry Notice does not constitute approval of Interim Reclamation. Interim Reclamation will be approved by the field inspection conducted after submittal of another Sundry Notice reporting vegetation has reached 80% coverage and site is ready for inspection of Interim Reclamation.
PermitForm: (06)
401690950
07/13/2018
GPS coordinates need to be updated, supply with Subsequent Report of Abandonment.
EngineerForm: (06)
401690950
09/02/2018
If there has not been a reported Bradenhead test within 60 days of plugging this well, prior to starting plugging operations a bradenhead test shall be performed. If the well was not sampled as part of a prior test it should be sampled if pressure is 25# or greater. If there is a need for sampling - contact COGCC engineering for verification of plugging procedures (Pressure greater than 25# or any liquids flowed to surface). 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. The Form 17 shall be submitted within 10 days of the test.
EngineerForm: (06)
401690950
09/02/2018
NOTE: Changes in plugging procedure - additional plug(2500') 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) If 1300' plug not circulated to surface then tag plug – must be 160’ or shallower and provide 10 sx plug at the surface (inside and outside of casing if not pulled). 3) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44.
EngineerForm: (06)
401690950
09/02/2018
If logs available for this well - submit all available to COGCC for inclusion in well file.
 
COGIS - Best Management Practice Results
No records to display.