WELL05-001-08057KALLSEN
1
OVERLAND RESOURCES LLC
19035
PA
12/16/2011
WATTENBERG
90750
ADAMS  001
CNE 2 1S65W 6
320107View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
2329725
12/14/2011
Please note - proposed plugs have changed: 1) Provide 24 hour notice of MIRU to Mike Hickey at 970-302-1024 or e-mail at Mike.Hickey@state.co.us. 2) For 1350’, 670’ and 350’ plugs: perforate casing, pump plug and displace, shut-in, WOC 4 hours and tag plug. Leave at least 100’ cement in the casing for each plug. 3) Properly abandon flowlines as per Rule 1103.
EngineerForm: (06)
404350531
12/10/2025
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2) Pump surface casing shoe plug 262' only after isolation has been verified. If surface casing cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 162' or shallower and provide a minimum of 10 sx plug at the surface. 3) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 4) After cut and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging recording. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years. 5) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed.
OGLAForm: (06)
404350531
12/10/2025
Due to proximity to a wetland, surface water and expected shallow groundwater, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the wetland and surface water.
OGLAForm: (06)
404350531
12/10/2025
Notification will be given to any adjacent building unit occupants within 1,000 feet of the wellhead of planned P&A start date.
EngineerForm: (06)
404350531
12/11/2025
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
404350531
12/11/2025
CHANGE TO SUBMITTED DESIGN 1. Increased plug at 1383' to 20 sacks cement for additional coverage. MUST TAG ABOVE 1213', IF NOT, REACH OUT TO ECMC STAFF 2. Lower plug at 655' down to 670'. Cement volume stays the same. MUST TAG ABOVE 570', IF NOT, REACH OUT TO ECMC STAFF
 