| Engineer | Form: (04) 401963780 11/10/2021 | Produced gas volumes are to be metered and reported and all gas used onsite documented in Form 7 Monthly Report of Operations.
Operator shall provide details of gas usage onsite by providing how it is used and the requirements by equipment type. Provide this data via Sundry Form 4 Other by November 23, 2021. |
| Engineer | Form: (04) 401963780 11/10/2021 | Operator shall have an approved Gas Capture Plan or have sought and received a variance from the COGCC Commission for continued production without gas infrastructure, prior to January 15, 2022 or wells must be shut in by January 16, 2022. |
| Engineer | Form: (04) 401963780 11/10/2021 | Provide gas analysis including H2S by November 30, 2021. |