| Engineer | Form: (06) 2170337 08/10/2012 | 1) Provide 24 hour notice of MIRU to Randy Edelen at 970-520-2531 or e-mail at Randy.Edelen@state.co.us. 2) For 670’ plug: pump plug and displace, shut-in, WOC 4 hours and tag plug, must be 280’ or shallower. Leave at least 100’ cement in the casing for each plug. If 260’ plug not circulated to surface top off surface with 10 sx. 3) Properly abandon flowlines as per Rule 1103. |
| Engineer | Form: (06) 2170337 08/10/2012 | File Form 15 Pit Report for pit(s) present even if at common battery, if pit to be closed file Form 27 for prior approval of remediation. |
| Permit | Form: (04) 400591691 05/02/2014 | PER RULE 1003.e.(3) OPERATOR SHALL SUBMIT SUNDRY NOTICE REPORTING SITE IS READY FOR INTERIM RECLAMATION INSPECTION WHEN VEGETATION REACHES 80% COVERAGE.
Approval of this Sundry Notice does not constitute approval of Interim Reclamation. Interim Reclamation will be approved by the field inspection conducted after submittal of another Sundry Notice reporting vegetation has reached 80% coverage and site is ready for inspection of Interim Reclamation.
|