| Engineer | Form: (04) 402600891 04/20/2021 | The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402600891 04/20/2021 | This approval is good for one year and a new application must be made before September 3, 2021. Updates for the planned utilization of the well should be included with the application. |
| Engineer | Form: (04) 402919156 04/13/2022 | Effective Apr 30, 2022 this well will be designated inactive and must be properly returned to production, plugged, have an approved 5B or added to a Form 6A list no later than November 1, 2022. |