WELL05-001-07695HACK
12-14
EXTRACTION OIL & GAS INC
10459
PA
6/26/2019
WATTENBERG
90750
ADAMS  001
SWNW 14 1S65W 6
320022View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401770490
12/06/2018
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
401770490
12/06/2018
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Prior to placing the 751' plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 96' or shallower and provide 10 sack plug at surface. 4) Leave at least 100’ of cement in the wellbore for each plug. 5) Properly abandon on-location flowlines as per Rule 1105. File electronic Form 42 once abandonment is complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line, the operator must submit a Flowline Report, Form 44.
EngineerForm: (06)
401770490
12/06/2018
If there has not been a reported Bradenhead test within 60 days of plugging this well, prior to starting plugging operations, a Bradenhead test shall be performed. 1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. 3) If sampling is required contact COGCC engineering for an confirmation of plugging requirements prior to placing any plugs. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test.
EngineerForm: (04)
401869358
12/17/2018
Drilling Completion Report, Form 5 submitted after completion of work should include all formation tops.
EngineerForm: (04)
401869358
12/17/2018
Submitted CBL does not demonstrate required cement coverages. Before placing 2-7/8" second string and cementing in place. 1) Provide minimum of 200' of cement above the Niobrara top. (minimum 6810') 2) Provide coverage for Fox Hills and shallower aquifers - 100 sx at 1575'; 300 sx at 900' 3) Repaired 4-1/2" casing shuld be pressure tested (>300#)after drilling out remedial plugs, if pressure test fails - COGCC should be contacted prior to running new second string.
 
COGIS - Best Management Practice Results
No records to display.