Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-001-06785PUGH
20-7
RENEGADE OIL & GAS COMPANY LLC
74165
PA
12/18/2018
WATTENBERG
90750
ADAMS  001
SWNE 20 2S64W 6
319788View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401802687
11/02/2018
NOTE: Changes in plugging procedure - aplug deepened (1700') and plug listed as annulus (500') is actually perforated and 50 sx pumped 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) After pumping 2538' plug - casing should be pressured to 300 psi to assure that HIC were isolated. If pressure bleeds off contact COGCC for further instructions. 3) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44.
 
COGIS - Best Management Practice Results
No records to display.