Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-001-06133UPRR-EHN
12-17 (OWP)
PAINTED PEGASUS PETROLEUM LLC
10711
SI
9/1/2021
NILE
57400
ADAMS  001
SWNW 17 1S60W 6
319650View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
400627978
06/18/2014
NOTE: Changes in plugging procedure - 2 sx cement required on RBP at 6350' 1) Provide notice of plugging to inspector John Montoya, 970-397-4124. 2) If surface plug not circulated to surface - tag plug , must be 85' or shallower. Provide 10 sx plug at the surface. Leave at least 100’ cement in the casing for each plug. 3) File Subsequent Report of Abandonment. 4) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.