DocNum:404289898Date Rec'd:7/22/2025
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC Oper. No.8960
Address:555 17TH STREET SUITE 3700  DENVER  CO 80202
Company Rep.NATHAN S  BENNETT
Well Name/No. 
Location   
Fac.ID:Fac.Type:
API number:05--County
CECMC Rep:Trent  Lindley Phone:720(765-0031 )
Alleged Violation(s):
Alleged Violation Issue:
Date Of Alleged Violation:  12/4/2024Date Of Initial Discovery:  12/4/2024
Pursuant to Rule 207, any report required under the Commission’s Rules or requested by the Director or the Commission will be timely filed, accurate, complete, and comply with the requirements set forth in the Commission’s Rules or any requirement set by the Director or the Commission. On December 4, 2024, ECMC Staff was notified that Bonanza Creek Energy Operating Company, LLC (“Operator”) had submitted falsified data in previously submitted records. The falsified data were submitted in multiple Forms 27 and pertained to analytical results which affected soil, groundwater, and inorganic and organic contaminant data. Operator failed to file accurate and complete reports, violating Rule 207.

Act, Order, Regulation, Permit Conditions Cited:
    Rule:  207.Description:  Reports

Abatement Or Corrective Action Required To be Performed by Operator
Action Due Date: ; 8/19/2025
Within 28 days, deliver a prioritized plan to comply with direction provided by Staff on May 20, 2025 to reassess and remediate all remediation projects affected by falsified data. The plan will achieve reassessment and delineation of all falsified data locations within 6 months under approved Forms 27 workplans. Operator will fully remediate all soil only contamination locations within 1 year.

This section To be completed by Operator when alleged violation Is corrected
Action Complete Date:  N/A
 
Date Of Alleged Violation:  12/4/2024Date Of Initial Discovery:  12/4/2024
Pursuant Rule 602.a, Bonanza Creek Energy Operating Company, LLC (“Operator”) will familiarize their employees, contractors, and subcontractors with the Commission’s Rules as they relate to the person’s job functions. Pursuant to Rule 602.c., Operator is responsible for ensuring that operations are conducted with due regard for the safety of employees, for the preservation and conservation of property, and for protecting and minimizing adverse impacts to public health, safety, welfare, the environment, and wildlife resources. Operator notified ECMC Staff on December 4, 2024, to report the manipulation of data in previously submitted records. The falsified analytical results, submitted by Operator’s contractor, were used in multiple Form 27 reports, affecting soil, groundwater, and inorganic and organic contaminant data. The contaminated soil, groundwater, and inorganic and organic contaminants remained in-situ as a result of the submission of falsified data, because Operator failed to ensure its contractor understood the requirements of the Commission’s Rules and failed to ensure that timely and accurate records were submitted with due regard for protecting and minimizing adverse impacts to public health, safety, welfare, the environment, and wildlife resources. Operator failed to train and supervise its contractor to ensure its contractor understood the requirements of the Commission’s Rules, and failed to ensure that records were submitted with due regard for protecting and minimizing adverse impacts to public health, safety, welfare, the environment, and wildlife resources, violating Rule 602.a. and c.

Act, Order, Regulation, Permit Conditions Cited:
    Rule:  602Description:  General Safety Requirements

Abatement Or Corrective Action Required To be Performed by Operator
Action Due Date: ; 8/19/2025
Within 28 days, deliver a prioritized plan to comply with direction previously provided by Staff on May 20, 2025 (document no. 2193454) to reassess and remediate all remediation projects affected by falsified data. The plan will achieve reassessment and delineation of all falsified data locations within 6 months under approved Forms 27 workplans. Operator will fully remediate all soil only contamination locations within 1 year.

This section To be completed by Operator when alleged violation Is corrected
Action Complete Date:  N/A
 

Company Rep:Trent Lindley Title:NOAV Specialist
Signature?Date:  7/22/2025
CECMC Signature? Date: 7/22/2025
Resolution approved by:  Title: 