COGIS - Remediation Reports
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
TANK BATTERY486707BYDALEK 28C-20HZ Tank Battery
KERR MCGEE OIL & GAS ONSHORE LP
47120
AC
5/15/2024
 
 
WELD  123
SWSW 20 2N65W 6
430616View Related Related
 
Form 27/27AView Related Related View DocsDoc
Date Submitted:5/16/2024
Date Recv'd:5/16/2024Assigned by:Laurel Anderson
DocNum:403784380Facility ID: 486707
Document Type:FORM 27 Project Number:35446
Operator Information:
Operator:KERR MCGEE OIL & GAS ONSHORE LP
Oper. No.47120
Address:P O BOX 173779  DENVER  CO 80217-3779
Type Of Facility:SPILL OR RELEASE
Fac. NameBydalek 3, 4, 28, 29N, 28, 29, 30C
County Name:WELD
Operator contact:Ariana Ochoa
qtrqtr: SWSWsection: 20township: 2Nrange: 65Wmeridian: 6
Remediation Details:
Impacted Media
MediaImpactedExtentHow Determined?
GROUNDWATER UTBD Groundwater Samples/Laboratory Analytical Results
SOILS UTBD Soil Samples/Laboratory Analytical Results
Reason for Report: OTHER
Cause of Condition: OTHER
Potential Receptors: Pond 1,280 feet (ft) northwest. Water well 420 ft southwest. Occupied buildings 500 ft northeast, 68
 
HOW REMEDIATE:  Potential impacts that meet the criteria in Rule 912.b. will be reported to the Director in accordance with that Rule and a site-specific soil and/or groundwater remediation plan will be developed and submitted to the ECMC via a supplemental Form 27 in accordance with Rule 913. If reportable impacts are not encountered, a supplemental Form 27 requesting closure will be submitted within 90 days following completion of sampling activities. Field screening and applicable laboratory analytical results will be reported in all submittals. E&P waste records of material transported off-site are kept on file and available upon request.
 
INITIAL ACTION:  This form has been prepared in accordance with ECMC Rule 911.a to provide prior notice of the partial closure of the Bydalek 3,4,28,29N,28,29,30C production facility. Visual inspection and field screening of soils will be conducted following the permanent removal of three separators. Based on these observations, soil and groundwater (if present) samples will be collected and submitted for laboratory analysis to determine if concentrations and values are in compliance with ECMC Table 915-1. The topographic Site Location Map showing the geographic setting of the site is provided as Figure 1.
 
RECLAMATION PLAN:  The site will be reclaimed in accordance with ECMC 1000 Series Reclamation Rules.
 
SOURCE REMOVED:  If a suspected release is identified and confirmed through soil screening and/or laboratory analysis, soils will be removed and transported to a licensed disposal facility. Disposal records will be kept on file and available upon request.
 
Correspondence Log:
Final Resolution
DateCase Closed?Letter Sent?CECMC Person
N/ANNikki Graber
N/ANLaurel Anderson
 
Coordinates:
TypeFacility IDFacility Name/NumLat/Long
Facility486707BYDALEK 28C-20HZ Tank Battery
40.116939/-104.692600

Remediation487402Bydalek 3, 4, 28, 29N, 28, 29, 30C
40.116939/-104.692600