Form 27/27A | Related Doc |
Date Submitted: | 2/2/2024 |
Date Recv'd: | 2/2/2024 | Assigned by: | Chris Canfield |
DocNum: | 403673759 | Facility ID: | 485461 |
Document Type: | FORM 27 | Project Number: | 34318 |
Operator Information: |
Operator: | CRESTONE PEAK RESOURCES OPERATING LLC |
Oper. No. | 10633 |
Address: | 555 17TH STREET SUITE 3700 DENVER CO 80202 |
Type Of Facility: | SPILL OR RELEASE |
Fac. Name | Blue 3-65 33-32-31 |
County Name: | ADAMS |
Operator contact: | Costin McQueen |
qtrqtr: NWSW | section: 34 | township: 3S | range: 65W | meridian: 6 |
|
Remediation Details: |
|
Reason for Report: SPILL |
Cause of Condition: SPILL OR RELEASE |
Potential Receptors: |
|
HOW REMEDIATE: | Once source removal is complete the estimated timeframe to achieve no further action will be August 30, 2024. |
|
INITIAL ACTION: | Following drilling activities, the drill rig mats were removed and stained soil was observed. It is anticipated that the impacted material is greater than 10 cubic yards. |
|
RECLAMATION PLAN: | The location will remain an active oil and gas facility. Reclamation will be in accordance with COGCC 1000 series rules. |
|
SOURCE REMOVED: | Limited source removal occurred and approximately cubic yards have been removed and hauled for disposal. Confirmation soil samples were collected and submitted for ECMC Table 915 analysis. Analytical results indicate elevated levels of pH, SAR, DRO and ORO. Soil Sample points SS08, SS13, SS14, and SS19 were collected at the surface near the wellheads on top of a cement barrier. The elevated levels of pH are determined to be naturally occurring as a result of high alkalinity associated with cement products. Additional source removal will occur at SS08, SS13, SS14, and SS19 and confirmation soil samples will be collected for TPH (C6-C36), and SAR. |
|
Correspondence Log: |
|
Coordinates: |
Type | Facility ID | Facility Name/Num | Lat/Long |
Facility | 485461 | Blue 3-65 33-32-31 | 39.746223/-104.657348 |
|