Form 27/27A | Related Doc |
Date Submitted: | 8/24/2023 |
Date Recv'd: | 8/24/2023 | Assigned by: | Alexander Ahmadian |
DocNum: | 403507727 | API number: | 05-123-25800 |
Document Type: | FORM 27 | Project Number: | 31214 |
Operator Information: |
Operator: | NOBLE ENERGY INC |
Oper. No. | 100322 |
Address: | 1099 18TH STREET SUITE 1500 DENVER CO 80202 |
Type Of Facility: | SPILL OR RELEASE |
Fac. Name | Houndseeker H01-17 |
County Name: | WELD |
Operator contact: | Jason Davidson |
qtrqtr: NWNE | section: 1 | township: 3N | range: 65W | meridian: 6 |
|
Remediation Details: |
|
Reason for Report: OTHER |
Cause of Condition: OTHER |
Potential Receptors: NA |
|
HOW REMEDIATE: | NA |
|
INITIAL ACTION: | Pursuant to ECMC Rule 911 a site investigation will be conducted pertaining to the HOUNDSKEEPER H01-17 wellhead cut and cap and flowline removal. Approximately 1827’ of flowline will be removed. The ECMC will be updated in a supplemental Form 27 if a portion of the flowline is abandoned-in-place due to field constraints. The wellhead will be cut and capped per ECMC rules. Additionally, soil samples will be field screened at the N-E-S-W sides of the wellhead. Soil samples will be taken along the flowline at any points of material change and/or hammer unions, directional changes, as well as at the bell holes on either side of a waterway. The Flowline Pre-Abandonment Notice Document number is included under Related Forms. |
|
RECLAMATION PLAN: | Reclamation will be in accordance with ECMC 1000 Series Rules. |
|
SOURCE REMOVED: | No source was generated. |
|
Correspondence Log: |
Final Resolution | Date | Case Closed? | Letter Sent? | CECMC Person | N/A | N | | Alexander Ahmadian | | N/A | N | | Laurel Anderson | | N/A | N | | Alexander Ahmadian | |
|
|
Coordinates: |
Type | Facility ID | Facility Name/Num | Lat/Long |
Facility | 295738 | HOUNDSKEEPER H 1-17 | 40.257490/-104.606974 |
|
Remediation | 486065 | Houndseeker H01-17 | 40.259384/-104.609636 |
|