Skip to Main Content

Incident Search

COGIS - Remediation Reports
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION415194TALON VIEW
6-9
PDC ENERGY INC
69175
CL
4/13/2022
SPINDLE
77900
THORNTON/ADAMS  001
SWNW 9 1S67W 6
415194View Related Related
 
Form 27/27AView Related Related View DocsDoc
Date Submitted:12/30/2021
Date Recv'd:12/30/2021Assigned by:Chris Canfield
DocNum:402913307Facility ID: 415194
Document Type:FORM 27 Project Number:21470
Operator Information:
Operator:PDC ENERGY INC
Oper. No.69175
Address:1775 SHERMAN STREET - STE 3000  DENVER  CO 80203
Type Of Facility:LOCATION
Fac. NameTALON VIEW
County Name:ADAMS
Operator contact:Jason Davidson
qtrqtr: SWNWsection: 9township: 1Srange: 67Wmeridian: 6
Remediation Details:
Impacted Media
MediaImpactedExtentHow Determined?
GROUNDWATER UUnknown Not yet determined
SOILS UUnknown Not yet determined
Reason for Report: OTHER
Cause of Condition: OTHER
Potential Receptors: The Talon View tank battery is surrounded by existing and developing residential properties to the n
 
HOW REMEDIATE:  A remediation or closure plan will be developed based on the results of the confirmation soil sampling results.
 
INITIAL ACTION:  Great Western proposes to conduct closure of the Talon View 6-9 tank battery and seven wells and associated on-location flowlines. P&A of the seven wells is scheduled to commence on 1/3/2022 and be completed by 1/30/2022. Tank battery closure, wellhead cut and cap, and flowline removal activities are planned to commence on 1/24/22 and be completed by 3/4/21. Great Western will conduct site investigation activities, field screening, and confirmation soil sampling activities during closure in accordance with COGCC 900 Series Rules. Discreet soil samples will be collected and analyzed pursuant to Rule 915, following the general sample collection guidance in Rule 915.e.(2). All waste generated during the closure activities will be managed and disposed of at a licensed disposal facility in accordance with Rules 905 and 906.
 
RECLAMATION PLAN:  If necessary, the site will be reclaimed in accordance with COGCC 1000-Series Rules.
 
SOURCE REMOVED:  If impacted soil is encountered, the Operator will either dig and haul impacted soils to a commercial landfill or treat impacted soils above COGCC Table 915-1 concentration levels onsite.
 
Correspondence Log:
Final Resolution
DateCase Closed?Letter Sent?CECMC Person
N/ANChris Canfield
N/ANChris Canfield
1/11/2023YChris Canfield
N/ANJason Kosola
 
Coordinates:
TypeFacility IDFacility Name/NumLat/Long
Remediation415181TALON VIEW
11-9
39.982210/-104.898599

Remediation415188TALON VIEW
22-9
39.982129/-104.898598

Remediation415193TALON VIEW
6-9
39.982252/-104.898599

Facility415194TALON VIEW
6-9
39.982250/-104.898590

Remediation415197TALON VIEW
12-9
39.982169/-104.898599

Remediation415200TALON VIEW
3-9
39.982340/-104.898600

Remediation415201TALON VIEW
5-9
39.982383/-104.898600

Remediation415202TALON VIEW
21-9
39.982295/-104.898600