COGIS - Remediation Reports
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
SPILL OR RELEASE480896Miracle 40N-11HZ Produced Water
KERR MCGEE OIL & GAS ONSHORE LP
47120
CL
3/22/2022
 
 
JOHNSTOWN/LARIMER  069
NESE 12 5N68W 6
333301View Related Related
 
Form 27/27AView Related Related View DocsDoc
Date Submitted:12/3/2021
Date Recv'd:12/3/2021Assigned by:Rick Allison
DocNum:402868040Facility ID: 480896
Document Type:FORM 27 Project Number:21094
Operator Information:
Operator:KERR MCGEE OIL & GAS ONSHORE LP
Oper. No.47120
Address:P O BOX 173779  DENVER  CO 80217-3779
Type Of Facility:SPILL OR RELEASE
Fac. NameMiracle 40N-11HZ Produced Water
County Name:LARIMER
Operator contact:Phillip Hamlin
qtrqtr: NESEsection: 12township: 5Nrange: 68Wmeridian: 6
Remediation Details:
Impacted Media
MediaImpactedExtentHow Determined?
GROUNDWATER YTBD Groundwater samples/laboratory analytical results
SOILS YTBD Inspection/soil samples/laboratory analytical results
Reason for Report: SPILL
Cause of Condition: MULTIPLE
Potential Receptors: Multiple buildings and livestock holding pens are located within ΒΌ mile of the facility. A building
 
FURTHER SITE INV:  Excavation and site assessment activities are ongoing, and will be summarized in a forthcoming Form 27-Supplemental update.
 
HOW REMEDIATE:  Additional potential impacts that meet the criteria outlined in Rule 912.b.(1) A. through J. will be reported to the Director in accordance with Rule 912.b.(1). A site-specific soil and/or groundwater remediation plan will be developed and submitted to the COGCC through a Form 27-Supplemental in accordance with Rule 912.c.(1). Field observations, screening results and applicable laboratory analytical results will be provided in the Form 27-Supplemental. E&P waste records of material transported off-site will be kept on file and available upon request.
 
INITIAL ACTION:  This form has been prepared in accordance with COGCC Rule 911.a to provide prior notice of the removal and resetting of two separators and one produced water vessel at the Miracle 16 20-12 O SA production facility. The first (middle) separator was removed due to a reportable release from the produced water dump line below the separator. A Form 19-Initial Supplemental Spill/Release Report (COGCC Document No. 402833694) was submitted on October 7, 2021, and the COGCC issued Spill/Release Point ID 480896. The second (southernmost) separator will be removed to address impacted soils associated with the release. The dumplines will be removed to the extent necessary to facilitate remediation of the separator release.The produced water vessel will be removed to investigate suspected impacts below the vessel. Soil and groundwater sample location and field screening data are presented in Table 1. A topographic site map showing the geographic setting of the site location is provided as Figure 1. Excavation and assessment activities are ongoing and will be summarized in a forthcoming Form 27 Supplemental update.
 
MONITORING PLAN:  Groundwater monitoring wells will be installed at the tank battery location to fully delineate the extent and magnitude of the remaining residual dissolved-phase groundwater impacts. The temporary groundwater monitoring wells will be sampled on a quarterly basis and submitted for laboratory analysis of Table 915-1 constituents. A groundwater monitoring location figure illustrating the locations of the surveyed temporary monitoring wells will be provided in a Form 27-Supplemental update.
 
RECLAMATION PLAN:  The affected infrastructure will be replaced, pending completion of impacted soil excavation activities. The site will be reclaimed in accordance with COGCC 1000 Series Reclamation Rules, pending future facility decommissioning activities.
 
SOURCE REMOVED:  Impacted soils will be removed and transported to a licensed disposal facility in accordance with Rules 905 and 906. Disposal records will be kept on file and available upon request.
 
Correspondence Log:
Final Resolution
DateCase Closed?Letter Sent?CECMC Person
N/ANNikki Graber
N/ANRick Allison
5/25/2023YNikki Graber
N/ANNikki Graber
N/ANNikki Graber
 
Coordinates:
TypeFacility IDFacility Name/NumLat/Long
Remediation333301MIRACLE
40N-11HZ
40.413509/-104.945540

Facility480896Miracle 40N-11HZ Produced Water
40.413808/-104.946281