TANK BATTERY479258Sheley 1 battery
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
1/25/2021
 
 
FIRESTONE/WELD  123
SESW 4 2N67W 6
318143View Related Related
 
Form 27/27AView Related Related View DocsDoc
Date Submitted:2/8/2021
Date Recv'd:2/8/2021Assigned by:Peter Gintautas
DocNum:402591326Facility ID: 479258
Document Type:FORM 27 Project Number:16598
Operator Information:
Operator:CRESTONE PEAK RESOURCES OPERATING LLC
Oper. No.10633
Address:555 17TH STREET SUITE 3700  DENVER  CO 80202
Type Of Facility:SPILL OR RELEASE
Fac. NameSheley 1 separator
County Name:WELD
Operator contact:Jacob Evans
qtrqtr: NESWsection: 4township: 2Nrange: 67Wmeridian: 6
Remediation Details:
Impacted Media
MediaImpactedExtentHow Determined?
SOILS UNo documented impacts Pending investigation
Reason for Report: OTHER
Cause of Condition: SITE/FACILITY CLOSURE
Potential Receptors: Occupied structures
 
HOW REMEDIATE:  No impacts have been identified at this time. When the vessels were originally removed, a remediation project was not opened, and soil samples were not collected. This form aims to address the data gaps described above.
 
INITIAL ACTION:  This form has been prepared to support removal of two partially buried produced water vessels associated with this location. When two produced water vessels were removed from this production facility, soil samples were not collected. Multiple hand auger borings will be completed to approximately 6 feet below ground surface (6' bgs) in the previous locations of the vessels. Proposed soil boring locations are attached. Soil samples will be field screened using a photoionization detector (PID) at each 1-foot interval beginning at approximately 2' bgs. At least two soil samples per vessel will be collected and submitted for Table 915-1 constituents of concern: one base sample and one sidewall sample. The soil sample from each vessel which displays the highest degree of impacts as determined by field screening using a photoionization detector (PID), visual observations of staining, and hydrocarbon odor will be submitted for the full Table 915-1 analyte list minus Soil Suitability for Reclamation constituents. The soil sample deemed the next most impacted by field screening results will be analyzed for any constituents of concern which exceed Table 915-1 allowable limits in the most impacted sample and that cannot be cleared by background levels. If the most impacted sample does not exceed for any constituents of concern, the subsequent sample will be analyzed for TPH (DRO, GRO, and ORO) and BTEX. Soil samples will be screened against residential soil screening levels unless groundwater is encountered. The facility is not being decommissioned or scheduled for reclamation at this time; therefore, samples will not be analyzed for Table 915-1 inorganic constituents to determine soil suitability for reclamation (pH, EC, SAR, and boron) at this time. Background samples may be collected during site investigation to characterize background levels of inorganic constituents in native soils.
 
RECLAMATION PLAN:  This facility remains in production; reclamation is not scheduled at this time. When the facility is decommissioned at a later date, reclamation activities will be completed in accordance with 1000 Series Rules.
 
SOURCE REMOVED:  If impacts are identified by field observations or laboratory analysis, soils may be removed and transported to a licensed disposal facility. Waste manifests will be available upon request. If different remediation tactics are deemed necessary or preferred, they will be proposed for approval via F27s.
 
Correspondence Log:
Final Resolution
DateCase Closed?Letter Sent?CECMC Person
N/ANKari Brown
N/ANNikki Graber
N/ANKari Brown
N/ANPeter Gintautas
N/ANKari Brown
N/ANKari Brown
N/ANPeter Gintautas
N/ANKari Brown
N/ANKari Brown
N/ANKari Brown
N/ANPeter Gintautas
N/ANPeter Gintautas
N/ANPeter Gintautas
N/ANKari Brown
N/ANLaurel Anderson
 
Coordinates:
TypeFacility IDFacility Name/NumLat/Long
Remediation479236Sheley 1 separator
40.163573/-104.899443

Facility479258Sheley 1 battery
40.163554/-104.899792

Remediation479403Sheley 1 Battery
40.163659/-104.899719

Remediation480273Sheley 1
40.163715/-104.899720