SPILL OR RELEASE448739SPILL/RELEASE POINT
CHEVRON USA INC
16700
CL
4/14/2021
RANGELY
72370
RIO BLANCO  103
SENW 19 2N102W 6
314569View Related Related
 
Form 27/27AView Related Related View DocsDoc
Date Submitted:3/31/2017
Date Recv'd:3/31/2017Assigned by:Kris Neidel
DocNum:401176729Facility ID: 448739
Document Type:FORM 27 Project Number:10116
Operator Information:
Operator:SCOUT ENERGY MANAGEMENT LLC
Oper. No.10779
Address:13800 MONTFORT DRIVE SUITE 100  DALLAS  TX 75240
Type Of Facility:SPILL OR RELEASE
Fac. NameSPILL/RELEASE POINT
County Name:RIO BLANCO
Operator contact:Chris Patterson
qtrqtr: SENWsection: 19township: 2Nrange: 102Wmeridian: 6
Remediation Details:
Impacted Media
MediaImpactedExtentHow Determined?
SOILS YHigh salt in area contacted Oprator knowledge from injection water properties
Reason for Report: SPILL
Cause of Condition: MULTIPLE
Potential Receptors: None
 
HOW REMEDIATE:  Free fluids were removed as quickly as possible to prevent soak in, after all free fluids were removed, water washing was started with heated water as the temperature was below freezing, and it was decided that less residence time of the salt water would be better for the vegetation during spring growth. Water washing was completed in a week. Technology is to pull out as much salt as possible from the soil through diffusion, and to drive the deepest salt below the root zone of the plants to allow vegetation to grow unaffected in the spring. It was determined that sampling should wait until the ground was no longer frozen, to get a better sample data, and to allow accurate background sampling due to the snow cover on the un affected areas. It is anticipated that the first sample data received will show NFA status.
 
INITIAL ACTION:  At 7:10 am the release occured, and was noticed on our pressure monitoring system. Operators were immediately dispacthed to shut in the line. Vac trucks were sent to pull the produced water, and a hot water truck was requested so that water washing could occur before the spring. All injection fluids recovered were taken to truck unloading to be reinjected.
 
MONITORING PLAN:  No impact to groundwater
 
RECLAMATION PLAN:  No digging was done as a part of the remediation, thus if the water washing was effective at keeping the vegetation from seeing significant degradation, no reclamation will be necessary. If significant degradation is noticed the area will be managed along with the operators stormwater remediation efforts across the field.
 
SOURCE REMOVED:  The pipe was excavated, a 10-20-foot section on each side was removed to ensure no corrosion was left, and stainless was used as the replacement material to prevent corrosion in the future.
 
Correspondence Log:
 
Coordinates:
TypeFacility IDFacility Name/NumLat/Long
Facility448739SPILL/RELEASE POINT
40.130622/-108.888345