Skip to Main Content

Incident Search

COGIS - Mechanical Integrity Test Report
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-01031LEVISON
12
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
3/1/2021
RANGELY
72370
RIO BLANCO  103
SENW 26 2N102W 6
314243View Related Related
 
Form 21View Related Related View DocsDoc
Date Submitted:N/AMIT Assigned By:DILLON, DAVID
Date Recv'd:2/4/2008Facility ID: 150200
DocNum:2082626Facility Status:AC
Operator Information:
Oper. No.16700
Operator:CHEVRON U S A INC
Address:6001 BOLLINGER CANYON RD  SAN RAMON  CA 94583
Type Of Facility:UIC ENHANCED RECOVERYWell Status: AC
Facility NameLEVISON
Operator contact:DIANE  PETERSON
Location:  qtrqtr: SENE section: 16 township: 2N range: 103W meridian: 6
MIT Details:
Test Type:VERIFICATION OF REPAIRS
Repair Type:TUBING/PACKER LEAK
Repair Desc:Fished packers, replaced tubing with 186 joints new fiberlined 2 7/8" tubing.
Test Date:1/30/2008
Field Rep:
Approved Date:2/4/2008
Approved by:DILLON, DAVID
Last Approved MIT:4/6/2007
Injection/Producing Formation Zones:WEBR
Perforation Interval:NA
Open Hole Interval:6090-6748
Bridge/Cement Plug Depth:NA
Tubing Size:2.875
Tubing Depth:6046
Top Packer Depth:5960
Multiple Packers:Y
 
Condition of approval:
Test Data:Wellbore Channel Test:
Reading TypePressure
10 MIN CASE810
5 MIN CASE810
CASE BEFORE
FINAL CASE810
FINAL TUBE
INITIAL TUBE
LOSS OR GAIN0
START CASE810
No channel test.