Field Inspection Comments And Observations |
Insp. Comment | Inspection/Violation Comments |
FENCECOMMENT | WELLHEAD |
GENHOUSE | BATTERY SHARED WITH MOORE UPRC G 15-7 |
MISC | PLUNGER LIFT SYSTEM |
SPILCOM | BATTERY IS TORN DOWN / EXCAVATION OF SPILL / CALLED JOHN AXELSON |
TANKBAT | 1 X 300 BBL OIL TANK / 2 HIGH PRESSURE HORIZONTAL SEPERATORS / 2 METER RUNS EMISSION STACK |
WELLSIGN | WELLHEAD AND BATTERY |