Field Inspection Comments And Observations |
Insp. Comment | Inspection/Violation Comments |
ACTION | REPAIR BERMS / PLACE SIGN ON WELLHEAD ACCORDING TO RULE 210 / REPAIR ALL LEAKS / REMOVE ALL OIL SATURATED SOIL |
FENCECOMMENT | WELLHEAD |
FIREWALL | BERMS IN DISREPAIR |
GENHOUSE | NO SIGN ON WELLHEAD |
MISC | PLUNGER LIFT SYSTEM |
SPILCOM | OIL SATURATED SOIL AROUND HORIZONTAL SEPARATOR |
TANKBAT | 2 150 BBL LOW PROFILE TANKS / COVERED FIBERGLASS TANK / BERMED / SIGN / HORIZONTAL SEPARATOR-BP / BERMED / METER RUN |
WELLSIGN | BATTERY |