Form 21 | Related Doc |
Date Submitted: | 4/9/2007 | MIT Assigned By: | KING, KEVIN |
Date Recv'd: | 5/3/2007 | Facility ID: | 150200 |
DocNum: | 200109910 | Facility Status: | AC |
Operator Information: |
Oper. No. | 16700 |
Operator: | CHEVRON U S A INC |
Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 |
Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC |
Facility Name | EMERALD |
Operator contact: | DIANE PETERSON |
Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
|
MIT Details: |
Test Type: | VERIFICATION OF REPAIRS |
Repair Type: | OTHER |
Repair Desc: | Converted injection well to producing well. |
Test Date: | 3/21/2007 |
Field Rep: | |
Approved Date: | 5/3/2007 |
Approved by: | KING, KEVIN |
Last Approved MIT: | 10/16/2006 |
Injection/Producing Formation Zones: | WEBR |
Perforation Interval: | 5539 TO 5899 |
Open Hole Interval: | NA |
Bridge/Cement Plug Depth: | |
Tubing Size: | 2.875 |
Tubing Depth: | 5446.6 |
Top Packer Depth: | 5410.3 |
Multiple Packers: | N |
|
Condition of approval: |
|
Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | 800 | 5 MIN CASE | 800 | CASE BEFORE | 0 | FINAL CASE | 800 | FINAL TUBE | 0 | INITIAL TUBE | 0 | LOSS OR GAIN | 0 | START CASE | 800 |
| Channel Test | Test Date | TRACER SURVEY | 7/9/1993 |
|
|
|
|
|