Field Inspection Comments And Observations |
Insp. Comment | Inspection/Violation Comments |
ACTION | REPAIR OR REPLACE MASTER VALVE / BIO REMEDIATE WELL AROUND WELLHEAD |
FENCECOMMENT | WELLHEAD AND BATTERY |
FIREWALL | OK |
GENHOUSE | OK |
MISC | PLUNGER LIFT SYSTEM |
SPILCOM | OIL SATURATED SOIL AROUND WELLHEAD / LEAKING MASTER VALVE |
TANKBAT | 2-150 BBL LOW PROFILE TANKS / CONCRETE VAULT / HORIZONTAL SEPARATOR / METER RUN |
WELLSIGN | WELLHEAD AND BATTERY |