Field Inspection Comments And Observations |
Insp. Comment | Inspection/Violation Comments |
MISC | CASING CEMENTED TO PREVENT FUTURE CASING LEAK. |
SURFRH | CULTV FIELD |
TANKBAT | OIL TANK, WATER VAULT, HEATER TREATER, GAS METER RUN |
UICCOM | MIT CSG: 2000-2180 PSI IN 30 MINUTES. NO LEAK DETECTED. BH=175 THROUGHOUT TEST. |
WORKOV | ACTION WELL SERVICE RIG 305 AND BJ CEMENTERS RIGGED UP TO 1" CEMENT PRD CSG ANNULUS FROM 3637` WITH 560 SX BJLITE AND 200 SX 50:50 POZ. CEMENT TO SURFACE. |