Form 21 | Related Doc | Date Submitted: | 8/9/2012 | MIT Assigned By: | KOEHLER, BOB | Date Recv'd: | 8/13/2012 | Facility ID: | 150200 | DocNum: | 1772017 | Facility Status: | AC | Operator Information: | Oper. No. | 16700 | Operator: | CHEVRON USA INC | Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 | Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC | Facility Name | MCLAUGHLIN, S W | Operator contact: | DIANE L. PETERSON | Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
| MIT Details: | Test Type: | VERIFICATION OF REPAIRS | Repair Type: | TUBING/PACKER LEAK | Repair Desc: | FISH LEAKING PACKERS, ADD PERF, RUN 158 JTS FIBERLINED TUBING AND NEW PACKERS | Test Date: | 7/23/2012 | Field Rep: | | Approved Date: | 8/16/2012 | Approved by: | KOEHLER, BOB | Last Approved MIT: | 6/1/2009 | Injection/Producing Formation Zones: | WEBR | Perforation Interval: | 5618-6427 | Open Hole Interval: | NA | Bridge/Cement Plug Depth: | NA | Tubing Size: | 2.875 | Tubing Depth: | 5625 | Top Packer Depth: | 5543 | Multiple Packers: | Y | | Condition of approval: | | Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | | 5 MIN CASE | | CASE BEFORE | | FINAL CASE | 1180 | FINAL TUBE | | INITIAL TUBE | | LOSS OR GAIN | -20 | START CASE | 1200 |
| No channel test. |
|
|
|
|
|