Skip to Main Content

Incident Search

COGIS - Mechanical Integrity Test Report
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-01078FAIRFIELD KITTI B
1
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
4/30/2024
RANGELY
72370
RIO BLANCO  103
NWNW 17 2N102W 6
314276View Related Related
 
Form 21View Related Related View DocsDoc
Date Submitted:4/18/2011MIT Assigned By:KOEHLER, BOB
Date Recv'd:4/20/2011Facility ID: 150200
DocNum:1771301Facility Status:AC
Operator Information:
Oper. No.16700
Operator:CHEVRON USA INC
Address:6001 BOLLINGER CANYON RD  SAN RAMON  CA 94583
Type Of Facility:UIC ENHANCED RECOVERYWell Status: AC
Facility NameFAIRFIELD KITTI B
Operator contact:DIANE L.  PETERSON
Location:  qtrqtr: SENE section: 16 township: 2N range: 103W meridian: 6
MIT Details:
Test Type:VERIFICATION OF REPAIRS
Repair Type:TUBING/PACKER LEAK
Repair Desc:Replaced 198 joints of 2-7/8" fiberlined tubing.
Test Date:4/15/2011
Field Rep:
Approved Date:4/25/2011
Approved by:KOEHLER, BOB
Last Approved MIT:11/15/2007
Injection/Producing Formation Zones:WEBR
Perforation Interval:NA
Open Hole Interval:6447-6520
Bridge/Cement Plug Depth:NA
Tubing Size:2.875
Tubing Depth:6442
Top Packer Depth:6339
Multiple Packers:Y
 
Condition of approval:
Test Data:Wellbore Channel Test:
Reading TypePressure
10 MIN CASE800
5 MIN CASE800
CASE BEFORE
FINAL CASE800
FINAL TUBE
INITIAL TUBE
LOSS OR GAIN0
START CASE800
Channel TestTest Date
CBL N/A
TEMPERATURE SURVEY N/A
TRACER SURVEY N/A