Skip to Main Content

Incident Search

COGIS - Mechanical Integrity Test Report
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-06315MCLAUGHLIN, A C
33
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
7/22/2021
RANGELY
72370
RIO BLANCO  103
SWSW 11 2N103W 6
314667View Related Related
 
Form 21View Related Related View DocsDoc
Date Submitted:9/3/2009MIT Assigned By:KOEHLER, BOB
Date Recv'd:9/4/2009Facility ID: 150200
DocNum:1769552Facility Status:AC
Operator Information:
Oper. No.16700
Operator:CHEVRON U S A INC
Address:6001 BOLLINGER CANYON RD  SAN RAMON  CA 94583
Type Of Facility:UIC ENHANCED RECOVERYWell Status: AC
Facility NameMCLAUGHLIN, A C
Operator contact:DIANE L  PETERSON
Location:  qtrqtr: SENE section: 16 township: 2N range: 103W meridian: 6
MIT Details:
Test Type:VERIFICATION OF REPAIRS
Repair Type:TUBING/PACKER LEAK
Repair Desc:PLUGBACK LOWER WEBER FORMATION 6700-6953', FISHED SIE (SURFACE (SPECIAL?) INJECTION EQUIPMENT), RUN IN HOLE WITH 207 JOINTS 2 7/8" FIBERLINED TUBING.
Test Date:9/2/2009
Field Rep:
Approved Date:9/22/2009
Approved by:KOEHLER, BOB
Last Approved MIT:5/8/2007
Injection/Producing Formation Zones:WEBR
Perforation Interval:NA
Open Hole Interval:6605-6700
Bridge/Cement Plug Depth:
Tubing Size:2.875
Tubing Depth:6578
Top Packer Depth:6491
Multiple Packers:Y
 
Condition of approval:
FILE FORM 5A FOR NEW OPEN HOLE INTERVAL.
Test Data:Wellbore Channel Test:
Reading TypePressure
10 MIN CASE
5 MIN CASE
CASE BEFORE
FINAL CASE800
FINAL TUBE0
INITIAL TUBE
LOSS OR GAIN0
START CASE800
No channel test.