Skip to Main Content

Incident Search

COGIS - Mechanical Integrity Test Report
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-05714ASSOCIATED(SIDE TRACK)
A-2
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
7/1/2022
RANGELY
72370
RIO BLANCO  103
NWSE 24 2N103W 6
314445View Related Related
 
Form 21View Related Related View DocsDoc
Date Submitted:6/2/2009MIT Assigned By:KOEHLER, BOB
Date Recv'd:6/4/2009Facility ID: 150200
DocNum:1769414Facility Status:AC
Operator Information:
Oper. No.16700
Operator:CHEVRON U S A INC
Address:6001 BOLLINGER CANYON RD  SAN RAMON  CA 94583
Type Of Facility:UIC ENHANCED RECOVERYWell Status: AC
Facility NameASSOCIATED(SIDE TRACK)
Operator contact:DIANE L  PETERSON
Location:  qtrqtr: SENE section: 16 township: 2N range: 103W meridian: 6
MIT Details:
Test Type:5-YEAR UIC TEST
Test Date:6/1/2009
Field Rep:KRABACHER, JAY
Approved Date:6/5/2009
Approved by:KOEHLER, BOB
Last Approved MIT:6/8/2004
Injection/Producing Formation Zones:WEBR
Perforation Interval:5907-6502
Open Hole Interval:NA
Bridge/Cement Plug Depth:
Tubing Size:2.875
Tubing Depth:4435
Top Packer Depth:4377
Multiple Packers:Y
 
Condition of approval:
Test Data:Wellbore Channel Test:
Reading TypePressure
10 MIN CASE
5 MIN CASE
CASE BEFORE
FINAL CASE763
FINAL TUBE
INITIAL TUBE
LOSS OR GAIN-32
START CASE795
No channel test.