Form 21 | Related Doc |
Date Submitted: | 10/9/2008 | MIT Assigned By: | KOEHLER, BOB |
Date Recv'd: | 10/14/2008 | Facility ID: | 150200 |
DocNum: | 1618905 | Facility Status: | AC |
Operator Information: |
Oper. No. | 16700 |
Operator: | CHEVRON U S A INC |
Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 |
Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC |
Facility Name | LARSON, F V |
Operator contact: | DIANE L PETERSON |
Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
|
MIT Details: |
Test Type: | VERIFICATION OF REPAIRS |
Repair Type: | OTHER |
Repair Desc: | CHANGE OUT 182 JOINTS 2 7/8" TUBING WITH NEW FIBERLINED TUBING |
Test Date: | 10/6/2008 |
Field Rep: | |
Approved Date: | 10/16/2008 |
Approved by: | KOEHLER, BOB |
Last Approved MIT: | 5/10/2006 |
Injection/Producing Formation Zones: | WEBR |
Perforation Interval: | NA |
Open Hole Interval: | 6068-6487 |
Bridge/Cement Plug Depth: | |
Tubing Size: | 2.875 |
Tubing Depth: | 6033 |
Top Packer Depth: | 5882 |
Multiple Packers: | Y |
|
Condition of approval: |
186' BETWEEN TOP PACKER AND TOP OPEN HOLE OK-RPK. |
Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | 810 | 5 MIN CASE | 810 | CASE BEFORE | | FINAL CASE | 810 | FINAL TUBE | | INITIAL TUBE | | LOSS OR GAIN | 0 | START CASE | 810 |
| No channel test. |
|
|
|
|