Form 21 | Related Doc | Date Submitted: | 4/14/2010 | MIT Assigned By: | BROWNING, CHUCK | Date Recv'd: | 4/20/2010 | Facility ID: | 150200 | DocNum: | 1171208 | Facility Status: | AC | Operator Information: | Oper. No. | 16700 | Operator: | CHEVRON U S A INC | Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 | Type Of Facility: | UIC ENHANCED RECOVERY | Well Status: AC | Facility Name | WALBRIDGE, L B | Operator contact: | DIANE PETERSON | Location: | | qtrqtr: SENE | section: 16 | township: 2N | range: 103W | meridian: 6 |
| MIT Details: | Test Type: | 5-YEAR UIC TEST | Test Date: | 4/14/2010 | Field Rep: | BROWNING, CHUCK | Approved Date: | 4/20/2010 | Approved by: | BROWNING, CHUCK | Last Approved MIT: | 10/18/2005 | Injection/Producing Formation Zones: | WEBR | Perforation Interval: | NA | Open Hole Interval: | 5863-6370 | Bridge/Cement Plug Depth: | | Tubing Size: | 2.875 | Tubing Depth: | 5795.5 | Top Packer Depth: | 5652.6 | Multiple Packers: | | | Condition of approval: | | Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | | 5 MIN CASE | | CASE BEFORE | 0 | FINAL CASE | 805 | FINAL TUBE | 0 | INITIAL TUBE | 0 | LOSS OR GAIN | 0 | START CASE | 805 |
| No channel test. |
|
|
|
|
|