Field Inspection Comments And Observations |
Insp. Comment | Inspection/Violation Comments |
ACTION | PUT ON PRODUCTION, PASS A MECHANICAL INTEGRITY PRESSURE TEST OR PLUG AND ABANDON WITHIN SIX (6) MONTHS. |
FIREWALL | TANK BERM APPEARS ADEQUATE |
GENHOUSE | WEEDS OVERGROWN INSIDE TANK BERM AND AROUND TREATER |
MISC | INSPECTION CONDUCTED IN RESPONSE TO COMPLAINT-UNRESOLVED. SURFACE PRODUCTION EQUIPMENT REMOVED FROM WELL-INCAPABLE OF PRODUCTION. NOAV SENT TO OPERATOR 7/24/00. |
SPILCOM | OIL SATURATED SOIL INSIDE TANK BERM AND AROUND TREATER |
TANKBAT | (1) STEEL BOLTED PROD TANK, (1) VERT H-T, GAS METER REMOVED |