Form 21 | Related Doc |
Date Submitted: | 2/16/2011 | MIT Assigned By: | ONYSKIW, DENISE |
Date Recv'd: | 3/1/2011 | API number: | 05-103-05486 |
DocNum: | 2617242 | Facility Status: | AC |
Operator Information: |
Oper. No. | 16700 |
Operator: | CHEVRON USA INC |
Address: | 6001 BOLLINGER CANYON RD SAN RAMON CA 94583 |
Type Of Facility: | WELL | Well Status: AC |
Well Name/No. | CARNEY |
Operator contact: | DIANE L PETERSON |
Location: | | qtrqtr: NENW | section: 35 | township: 2N | range: 102W | meridian: 6 |
|
MIT Details: |
Test Type: | VERIFICATION OF REPAIRS |
Repair Type: | OTHER |
Repair Desc: | Pulled production equipment, run in hole with 161 joints DYB 2 7/8" tubing and packer. |
Test Date: | 2/11/2011 |
Field Rep: | |
Approved Date: | 3/1/2011 |
Approved by: | ONYSKIW, DENISE |
Last Approved MIT: | N/A |
Injection/Producing Formation Zones: | WEBR |
Perforation Interval: | NA |
Open Hole Interval: | 5833-6475 |
Bridge/Cement Plug Depth: | |
Tubing Size: | 2.875 |
Tubing Depth: | 5169.5 |
Top Packer Depth: | 5137 |
Multiple Packers: | N |
|
Condition of approval: |
|
Test Data: | Wellbore Channel Test: | Reading Type | Pressure | 10 MIN CASE | | 5 MIN CASE | | CASE BEFORE | | FINAL CASE | 790 | FINAL TUBE | | INITIAL TUBE | | LOSS OR GAIN | 0 | START CASE | 790 |
| No channel test. |
|
|
|
|